FDOT Announces Washington Blvd Resurfacing Project Through Downtown – Starting late 2026

FDOT Resurfacing

FDOT:  451017-2    SR 683 (US 301) from SR 45 (US 41) to South of 10th Street

 
Project Details
Work Type:Resurfacing
Phase:Construction
Limits:SR 683 (US 301) from SR 45 (US 41) to South of 10th Street
Length:1.07 miles
City:
County:
Road:
Construction Cost:$3.1 million
Start of Current Phase:Late 2026
Est. Completion of Current Phase:Mid 2027

The purpose of this project is Resurfacing, Restoration, and Rehabilitation (RRR) of approximately one mile of SR 683/ US 301 from US 41 to south of 10th Street. The project will mill and resurface existing roadway, including left and right turn lanes, median openings, and side street connections. The project will include improvements to comply with Americans with Disabilities Act (ADA) standards. The project also includes upgrades to pavement markings and signage, pedestrian signals and detectors at signalized intersections. The City of Sarasota has requested the addition of a new midblock crossing (Pedestrian Hybrid Beacon) to be installed at South Payne Parkway.

These proposed improvements are intended to enhance roadway quality, condition and safety for multimodal travel along SR 683/US 301.

 

Communications Team Contact Information
Nancy Morgan,   941-720-6335, Nancy.morgan@dot.state.fl.us
or

Barbara Catlin,  941-302-5048
barbara.catlin@dot.state.fl.us 

About Author

What do you feel about this?

Skip to content